Max-Planck-Institute for Astronomy
    VLTI photo by Johny
     Setiawan    ESPRI logo
Home
Overview
Science
Method
Hardware
Software
Team
Social activities
News
Links
Publications
ASTRID database (internal)
Document server (internal)
ESPRI wiki (internal, beta version)

ESPRI News

 February 2011 PRIMA is now alive!
The PRIMA astrometric functions are now fully operational and faint object off-axis fringe locking was demonstrated on its most fundamental principle with a "frozen fringe exposure" of 3 minutes! (a world premiere technical achievement in astronomy) The true astrometric commissioning of PRIMA with the ATs will begin in July 2011.

 10 July 2010 First dual-beam fringe-tracking
PRIMA works for the first time as a dual-star interferometer!
The first dual-star fringe-tracking was achieved on July 10, 2010, during commissioning run No. 11. Though still without the metrology that ties the two sub-interferometers together, this marks the transition from subsystem testing to PRIMA system commissioning.

 Feb 2010 Testing of DRS routines
Started systematic testing of DRS routines with (single-feed) commissioning data
 March 2009 PRIMA subsystem commissioning
will last throughout 2009.
Dual-feed (astrometric) commissioning is anticipated to start in Summer 2010.
 03 Sept. 2008 First light for PRIMA!
At end of AIV, FSU A has seen first fringes on sky, with AT1 and AT2 on baseline A0-D0. The target was HD19343 (K=0.44mag)

 August 2008 DDLs shipped to Paranal
DDLs shipped to Paranal, integrated in VLTI Lab, and aligned with PRIMA


 01 April 2008 Cat's eyes shipped to Geneva
Cat's eyes shipped to Geneva for Integration into DDLs and PAE tests. DDL "christening" celebrated during 8th ESPRI Science Team meeting on 1st April 2008 with swiss chacolate DDLs and Champaine.


 01 Feb. 2008 Website updated
Again, the format of this ESPRI website was updated.
 3 September 2007 DDL at MPIA
The Differential Delay Line (DDL) arrived at the MPIA site in Heidelberg, after delivery from the manufacturer Axsys.

ESPRI team members viewing the hardware in the MPIA interferometric laboratory.
 19 July 2007 Website updated
The format of this ESPRI website was updated.
 22 May 2007 Logo chosen
The final version of the ESPRI logo has been released.

PDF version
PNG version
Transparent GIF version
Other versions of the logo can be downloaded from the document server (password protected).
 3 April 2007 PAOS Final Design Review
The PRIMA Astrometric Observing Software passed its final design review at ESO headquarters in Garching.
MPIA logo ZAH logoGeneva logo ESO logo

last update: 01-02-2010
editor of this page: Ralf Launhardt